Serving Las Vegas and the whole valley
Free Quotes (702) 769-4416
Ram Masonry
Pool Decks and Coping in Las Vegas, NV
Our Services

Pool Decks and Coping in Las Vegas, NV

Pool Decks and Coping · Las Vegas, NV

Pool decks and coping built across the Las Vegas valley

A pool deck in Las Vegas has to drain well and offer sure footing when wet. Ram Masonry builds new pool decks in pavers or poured concrete once the pool builder finishes the shell. We replace cracked or sunken decks around existing pools and widen decks that are too narrow. We also set the coping, the cap where the deck meets the water. Ram Masonry has built in the valley since 2014. We hold Nevada C-18 masonry license number 0080771, bonded and insured, with workers' compensation coverage.

A pool deck call usually starts with a problem you can see. The deck has cracked or sunk, or it is only three feet wide. Coping is loose or chipped, or the surface feels too hot or slick. On the first visit we take measurements and check which way the deck drains. We look at the coping and the joint where it meets the deck. We also mark sprinkler lines and the pipe runs to the pool equipment. Call (702) 769-4416 to book a free written estimate.

What We Handle

  • New pool decks once the pool shell is done
  • Replacement decks around existing pools
  • Extensions that widen narrow pool decks
  • Paver pool decks over a packed base
  • Stamped concrete decks with grit in the sealer
  • Broom-finished concrete decks with fine ridges for traction
  • Pool coping in pavers, stone, brick or precast
  • Flexible joint between the coping and the deck
  • Deck slope set away from pool and house
  • Licensed C-18, bonded and insured

Free Pool Decks and Coping Quote

Tell us about your project and we’ll get right back to you.

What a pool deck job covers, and who does what

A pool deck job can mean a new deck around a new pool, after the shell is finished. It can mean tearing out an old deck and building a new one in its place. It can also be an extension that widens a narrow deck. The same job can add masonry, like block seat walls or raised planters along one side of the pool.

The pool builder handles the shell, the plaster, the tile line and the pool equipment. A licensed plumbing contractor runs any gas line. The City of Las Vegas requires a mechanical permit for gas piping. That includes a gas line for a BBQ, a fire pit or a pool heater. We build the deck, the coping and masonry like an outdoor kitchen or BBQ island.

Pavers, stamped concrete or a broom finish: which pool deck fits your yard?

A paver pool deck is built from separate units over a packed base. Small ground movement shows up as a paver or two out of line. We lift those units one at a time, fix the base and set them back. Paver coping in a matching color can finish the pool edge. The base work is laid out on our paver installation page.

Stamped concrete is one slab with a pattern pressed into the surface while it is wet. Once it cures, it gets a sealer. On pool decks the sealer carries a fine grit, which gives wet feet traction. The sealer needs fresh coats over the years, and the grit goes back in each time. Patterns and colors are on the stamped concrete page.

Broom-finished concrete is the simplest pool deck. Dragging a broom over the fresh slab leaves fine ridges that give wet, bare feet traction. One national cost guide lists poured concrete for less than stone or pavers around a pool. Whatever the surface, light colors feel cooler on bare feet than dark ones. We pour it the same way as our concrete patios.

Pool coping, where the deck meets the water

Coping is the cap on the pool's top edge, between the water and the deck. Common choices are paver bullnose, natural stone, brick and precast pieces. Each piece sets in mortar on the bond beam, the concrete top of the pool wall. We put a flexible joint between the coping and the deck. It lets the deck move in summer heat without pushing on the coping.

A deck redo is a good time to replace loose or chipped coping. One national cost guide puts pool coping at $40 to $80 per linear foot on average. It also says replacing old coping costs more than installing new. If the bond beam under it needs repair, that work goes to the pool builder first. Tile and plaster stay with the pool builder too.

How should a pool deck drain?

A pool deck should slope away from the water and the house. The City of Las Vegas pool handout requires a slope away from the pool, set by the deck surface. Clark County's pool code sends drainage from perimeter decks away from the pool and nearby buildings. At a stucco wall, the weep screed along its base sets a limit. City of Las Vegas pool inspections check that no slab is poured within 2 inches of it.

The National Weather Service says monsoon storms, typically in July and August, can bring heavy rain and flash flooding. That water, plus splash and sprinkler overspray, needs a path off the deck. Planters along the edge need drainage too, so wet soil does not sit against the slab. Block planter walls can hold those beds back. Before concrete or pavers go down, we strip soft soil and compact a base.

Do you need a permit for a pool deck in Las Vegas?

It depends on the city and the deck height. The City of Las Vegas exempts private concrete slabs not more than 30 inches above adjacent grade. It requires a permit to build a deck more than 30 inches above grade. Clark County's exemption names walks and driveways only. In the unincorporated valley, we confirm pool decks with the county desk. Henderson and North Las Vegas run their own desks, and we check the rule for your parcel.

The City of Las Vegas requires a barrier for any pool, hot tub or spa, and no exemption covers it. So the barrier has to stay in place through the job. The city calls its permit list a guide, not a complete one, and sends homeowners to the building department. Where your community requires it, HOA approval for a new deck surface comes before work starts.

Stamped concrete pool deck in a flagstone pattern curving around a pool Bullnose pool coping turning a corner beside a two-tone paver border

Ready to get started?

Free, no-obligation estimates across Las Vegas and the whole valley.

(702) 769-4416
How We Work

How a Job With Ram Masonry Runs

From the first look at the site to the final walk-through, here is exactly how it goes.

1

Look at the Job

Call or send the form, and photos by text get a fast first read. For a firm number we come out, measure the run, and check what sits under the job: grade, access, caliche, old work.

2

Price in Writing

You get a written price and timeline before any work starts. If a permit or engineering applies, the estimate says so. Repair and rebuild get quoted as separate numbers when both are on the table.

3

Build It Right

Footings dug to bearing and inspected, rebar and grout in the cells, base compacted before concrete, mortar kept from drying too fast in the heat. The parts you never see get built like the parts you do.

4

Walk It Together

We walk the finished work with you: walls plumb, joints full, slabs draining the right way, site cleaned up. Done means you have looked at every part of it and said so.

FAQ

Pool Decks and Coping Questions, Answered

Common questions about pool decks and coping across Las Vegas and the whole valley. Don't see yours? Give us a call and ask.

Call (702) 769-4416

How much does a pool deck cost in Las Vegas?
One national cost guide lists a ground-level pool deck at $5 to $35 per square foot installed, by material. The same guide adds about $5 per square foot to remove and dispose of an old deck. We measure your deck on site and send a free written estimate. Our pool deck cost guide breaks it down by surface.
Can you replace the deck around a pool I already have?
Yes. We take out the old deck, rebuild the base and set a new surface around the pool you have. The shell, plaster and tile stay as they are. The coping can stay, or we replace it if it is loose or chipped. The pool barrier stays in place while we work.
Pavers or concrete for a pool deck in Las Vegas heat?
Either surface can work around a Las Vegas pool. If the ground moves, we pull and reset single pavers. One national guide lists poured concrete for less than pavers. On both, light colors feel cooler on bare feet than dark ones. Broom texture or a gritty sealer adds traction for wet feet.
Can you replace pool coping without redoing the whole deck?
Yes, if the bond beam under the coping is sound. We remove the old coping and set new pieces in mortar on the beam. One national cost guide puts pool coping at $40 to $80 per linear foot on average. A damaged bond beam goes to the pool builder first.
Do I need a permit for a pool deck in Las Vegas?
It depends on the city and how high the deck sits. The City of Las Vegas exempts private concrete slabs not more than 30 inches above adjacent grade. Clark County's exemption names walks and driveways only, so we confirm pool decks with the county desk.
Do you build the pool too?
No. The pool builder handles the shell, the plaster, the tile and the pool equipment. We build the deck, the coping and the masonry around the pool, such as seat walls and fire pits. On a new pool, our deck work starts once the shell is finished. A licensed plumbing contractor runs any gas line.
More From Ram Masonry

Explore Our Other Services

Pavers in Las Vegas, NV

Pavers

Paver installation for driveways, patios and walkways across Las Vegas. We excavate, compact a road base, screed the sand and lay the pattern by hand. Free estimates.

Learn More
Patios in Las Vegas, NV

Patios

New concrete patios and patio extensions across the Las Vegas valley, plus pads for shade structures. Broom or trowel finish, poured on a prepped base. Free estimates.

Learn More
Fireplaces and Fire Pits in Las Vegas, NV

Fireplaces and Fire Pits

We build outdoor fireplaces, fire pits and pizza ovens in block, brick and stone. Wood or gas. Free written estimates.

Learn More
From Our Blog

Pool Decks and Coping Guides

Why Choose Ram

Why Las Vegas Calls Ram Masonry

Masonry Is the Trade

Block, brick, stone and concrete are the whole business, not a sideline. Footings dug to bearing, cells grouted around steel, joints struck full. That is why the walls we build stay straight.

Built for the Desert

Vegas heat and monsoon wind punish shortcuts. Early summer pours, mortar kept from drying too fast, drainage behind every retaining wall, footings cut through caliche instead of stopping on it.

Priced in Writing, Free

We look at the job, measure it, and put the price and timeline in writing before work starts. Photos by text get a fast first read. The estimate costs nothing either way.

Licensed, Bonded, Insured

Nevada C-18 masonry license #0080771, bond and insurance on file. The license is what lets us pull your wall permit, and it covers commercial work at the same standard as residential.

Start Your Project

Get In Touch With Ram Masonry

A wall that worries you, a driveway past its best, or a backyard ready to become the good part of the house? Call or send the form and we will look at the site with you and hand you a straight written quote.

Get a Free Quote

Tell us about your project and we’ll get right back to you.

Call (702) 769-4416